1.
|
|
Open
all bundles and check that you have received all items as noted in
the "Packing List" |
|
2.
|
|
Sort
items into left, right, back, front, sides and roof. |
|
3.
|
|
At
this point if you are going to erect the shade house on a concrete
slab/block, cut off all posts below the flange and flush with its
face. |
|
4.
|
|
Install
the caps on the four (4) corner posts (1) |
|
5.
|
|
If
mounted in the ground, mark out the post holes and dig as per "Post
Hole Detail Sheet. |
|
6.
|
|
Using
the "Fitting Layout Sheet", assemble each side Left and right)
flat
on the ground (minus the internal intermediate posts). Note:
Tighten the
fittings just sufficient to allow the sides to be stood up vertically
and
placed in the holes or on the slab. Support as necessary
|
|
7.
|
|
Place
the remaining posts, back, front and internal in their holes 0 and
0 |
|
8.
|
|
Assemble
back panel to the sides using the appropriate rails from the
Packing
List, Post and Rail Layout and Fitting Layout. It may be necessary
to slacken the fittings to mount the rails |
|
9.
|
|
Assemble
the front panel to the sides as for 8. above |
|
10.
|
|
Assemble
roof top rails 0 and 0 |
|
11.
|
|
Assemble
internal intermediate posts 0. |
|
12.
|
|
Install
shelf support rails 0 Approx. 600 to 700 from floor for convenient
use by pupils. |
|
13.
|
|
Tighten
all fittings, checking, squaring and levelling up as you proceed. |
|
14.
|
|
Check
and adjust rail positions, maintaining the nominal 2000min dimension
between top and bottom rails, all around. |
|
15.
|
|
Block
up unit level and with approximately 50mm clearance under bottom
rail. Cheek diagonals of total frame, adjust as necessary. |
|
16.
|
|
Install
shelves, preferably with edge of angle frame pointing down. |
|
17.
|
|
Install
gate, hinges on left hand. Adjust swing and closing. |
|
18.
|
|
All
being correct, pour concrete to holes, leave to cure for 24 hours. |
|
19.
|
|
Re-check
for square |
|
20.
|
|
Place
shade cloth envelope over frame, draw sides down carefully, firmly
and evenly. Adjust fit to frame as required. |
|
21.
|
|
Using
cable ties supplied, carefully tighten the shade cloth cover, working
it evenly down to the bottom rail. Keep the ends of the ties to the
inside
of the frame. |
|
22.
|
|
When
all cable ties are satisfactory, stand the roll of 200Omm chainwire
vertically at the gate hinge post (left hand). Bottom edge level with
the
top of the bottom rail. A useful third hand to support the chainwire
on the
top rail as it is wrapped around, is to make about 20 butchers hooks
from
stiff wire. Hook over top rail and into the chainwire mesh. |
|
23.
|
|
Using
the galvanised tie wire, fasten the chainwire to the post. Once
around the post, every second diamond and with all wire twists cut
off and
laid flat inside the frame (this is to avoid anyone catching themselves
on
it). |
|
24.
|
|
Fasten
the chainwire around the frame, drawing it firm as you go and
supporting it with ties on the top rail, keep the top selvedge under
the rail
and similarly on top of the bottom rail. Suggest tying every fourth
diamond. |
|
25.
|
|
Fasten
the chainwire around each corner post with the tie wire, three (3)
or four (4) ties on each. All cut ends inside the frame. |
|
26.
|
|
When
the chainwire is around the frame, adjust its length at the gate opening
by tying off to the gate post (right hand) and remove the excess
|
|
27.
|
|
Check
and complete any further tying. |
|
28.
|
|
Roof
cover: For these steps you will need step ladders for access |
|
29.
|
|
Raise
the roll of 2400 wide chainwire onto the roof. Align to sides.
Unroll starting at the back. Tie off at the back to the top rail.
Stretch out
and tie off to front top rail. Tie off to side rails |
|
30.
|
|
Check
all tying off for completeness. |
|
31.
|
|
Install
irrigating system to your needs using the "suggested configuration"
diagram as a guide |
|
|
|
|
|
|
|
Installation
on top of slab/block all as per previous steps denoted with * and
the following:- |
|
|
|
15(a).
Check diagonals of total frame, adjust as necessary and position on
the
slab/blocks. Mark position of dyna bolt holes. Move unit clear of
hole
positions. Drill all holes. Fit dyna bolts to holes. Position frame
over
dyna bolts and bolt down |
|
|
|
Your